Camp Li-Wa’s new lodge will be a multi-use building with space for an upgraded kitchen, dining area, and ample meeting space.

The lodge has been under construction for a few years now and is approaching completion.  Finishing this project is paramount to the growth of Camp Li-Wa programs moving forward.  In the last five years, we have seen an overwhelming increase in both our summer and winter programming – reaffirming the immediate need for our new lodge to be “on-line”.

In 2023 we:

  • Finalized interior kitchen framing
  • Built the fireplace case
  • Finalized the electrical rough in
  • Hung Drywall
  • Finalized the heating system
  • Built the loading dock area
  • Built a handicap ramp

In 2024 we plan on:

  • The installation of the kitchen’s air handling
  • The kitchen drop ceiling
  • Kitchen tile and stainless steel wall panels
  • Interior cultured stone
  • Mechanical installation for the walkin fridge and freezer
  • The final electrical trim out
  • Final insulation